Kestrel Lane GSP
Grid supply point survey ahead of winter peak. Five connections running hot, one critical.
6
ha
Area covered
22
min
Flight time
5
flagged
Anomalies found
88
°C
Hottest reading
Findings
275 kV clamp on SGT1 at 88.1 °C, priority 1
Two CT terminal boxes 12 K above ambient
Surge arrester leakage pattern on bay 7
Debrief
Flight lines were drawn around exclusion zones exported from the operator’s CAD drawing.
Each finding carries the asset tag from the operator’s register, so the work order lands on the right piece of plant.
It reads our asset register, so a finding arrives as SGT1, not as a pin on a photo.
Helen Okafor, asset integrity